
Guides
Practical, actionable guides to prepare a measurement campaign, choose an instrument or anticipate a regulatory deadline.
Key facts
- 50 yearsof expertise
- 4practical guides
- 100%actionable
- Expertsupport

Buyer's Guide to Emissions Measuring Instrumentation
The 5 criteria to check before investing in an industrial emissions sampling or measuring instrument
Choosing an emissions sampling or measuring instrument is not just a matter of comparing datasheets: an inspection body, a laboratory or an industrial company must check documented standards compliance (verifiable, not merely displayed), robustness under real industrial conditions, the availability of after-sales service and spare parts, total cost of ownership and the technical support offered. This guide details these five criteria and provides a checklist of questions to ask any supplier before signing.
Read the guide
How to Choose Your Dioxin Sampler
Standards compliance, short/long-term sampling, materials: the criteria that determine the reliability of your EN 1948 measurements
Choosing a dioxin sampler means choosing the reliability of your measurement result: no laboratory analysis step can correct a sampling defect on compounds present at extreme trace levels. The determining criteria are explicit standards compliance (EN 1948, USEPA Method 23), the ability to cover both short-term and long-term sampling, and inert materials that are easy to decontaminate between two campaigns.
Read the guide
Complying with IED 2.0 by 2026: An Action Plan for an Operator
Diagnosis, monitoring, investments: the roadmap of an environment/HSE manager facing Directive (EU) 2024/1785
Directive (EU) 2024/1785, known as IED 2.0, revises the Industrial Emissions Directive (2010/75/EU) and must be transposed by Member States by 1 July 2026 at the latest. For an operator of a regulated installation subject to the IED, the challenge is not to wait for the national transposition text but to anticipate now: broader scope, mandatory environmental management system, strengthened monitoring and transparency requirements, heavier penalties. This guide proposes a four-step method for building a realistic action plan.
Read the guide
Getting Ahead of the 2026 PFAS Regulation: What Operators Should Plan For
ICPE headings concerned, deadlines of the order of 31 October 2024, IED 2.0 and practical steps to avoid being caught short
The French order of 31 October 2024 already requires PFAS air measurement campaigns at waste incineration and co-incineration plants (ICPE headings 2770, 2771, 2971, 3520), on a timetable staggered between the end of 2025 and 2028. At European level, the revision of the IED directive (IED 2.0, transposition expected by 1 July 2026) paves the way for broader regulation of PFAS, without setting a harmonised threshold to date. This guide explains what is already mandatory, what remains uncertain, and the concrete steps to anticipate a deadline without being caught out by laboratory lead times.
Read the guide