Getting Ahead of the 2026 PFAS Regulation: What Operators Should Plan For

ICPE headings concerned, deadlines of the order of 31 October 2024, IED 2.0 and practical steps to avoid being caught short

The French order of 31 October 2024 already requires PFAS air measurement campaigns at waste incineration and co-incineration plants (ICPE headings 2770, 2771, 2971, 3520), on a timetable staggered between the end of 2025 and 2028. At European level, the revision of the IED directive (IED 2.0, transposition expected by 1 July 2026) paves the way for broader regulation of PFAS, without setting a harmonised threshold to date. This guide explains what is already mandatory, what remains uncertain, and the concrete steps to anticipate a deadline without being caught out by laboratory lead times.

Key figures

  • Order of 31/10/2024Founding text
  • 2770, 2771, 2971, 3520ICPE headings concerned
  • 49 substances (XP X 43-126)PFAS compounds covered

Why PFAS Is Becoming a Regulatory Issue for Industry

Per- and polyfluoroalkyl substances (PFAS) form a family of several thousand synthetic molecules used for decades for their chemical and thermal resistance and their water- and grease-repellent effect: fire-fighting foams, surface treatments, food packaging, technical textiles, electronics, and also certain industrial manufacturing processes. This very broad industrial usefulness is precisely what makes them today a cross-cutting regulatory issue, far more than historical persistent organic pollutants such as dioxins, whose sources are more circumscribed, ever were.

What the French Order of 31 October 2024 Already Requires

The order of 31 October 2024 on the analysis of per- and polyfluoroalkyl substances in atmospheric emissions applies to installations classified for environmental protection (ICPE) falling under at least one of headings 2770 (incineration of non-hazardous waste), 2771 (co-incineration of non-hazardous waste), 2971 (incineration/co-incineration of hazardous waste) and 3520 (incineration and co-incineration of waste, IED heading). It requires a PFAS sampling and analysis campaign at each channelled emission point from the thermal treatment of waste, covering 49 semi-volatile polar PFAS compounds as well as hydrofluoric acid and several ancillary parameters (flow rate, oxygen, etc.).

What IED 2.0 Provides at European Level

Alongside the French scheme, Directive (EU) 2024/1785 (known as IED 2.0, which revises the Industrial Emissions Directive), which entered into force on 4 August 2024, must be transposed by Member States by 1 July 2026 at the latest. It adds PFAS substances to the list of polluting substances in its Annex II, alongside the parameters already tracked under the European industrial emissions reporting (Industrial Emissions Portal).

Practical Steps for a Potentially Affected Operator

The first step, often overlooked, is to check precisely under which ICPE heading(s) the installation is classified and with what authorised capacity: an installation may fall under several headings simultaneously (for example 2771 and 3520), which determines the exact deadline applicable among the five dates in the order's timetable. If in doubt about the classification or the interpretation of a capacity threshold, the inspectorate for regulated installations (DREAL) remains the reference contact: better to resolve the doubt early than to discover non-compliance as the deadline approaches.

What Remains Uncertain

Several elements of the PFAS file remain in motion and should not be regarded as fixed. No harmonised European or international (ISO or CEN) standard for sampling and analysing PFAS in air has been finalised to date: CEN/TC 264 has launched a dedicated working group, but with no known publication timetable. The French standard XP X 43-126 retains experimental status for the time being, which means it may be revised before any final approval.

Mistakes to Avoid

The most costly mistake is to wait until the regulatory deadline approaches before getting organised. Given the small number of laboratories accredited for the XP X 43-126 method and the fact that several national deadlines fall on the same dates for entire categories of installations, an operator that starts six months before its deadline may run into a simple problem of available slots, unrelated to its own diligence.

Summary

Key takeaways

  • Check your exact ICPE classification

    Identify whether the installation falls under headings 2770, 2771, 2971 and/or 3520, alone or in combination, and its authorised capacity.

  • Determine your precise deadline

    Place your installation within the order's staggered timetable (31/10/2025, 30/04/2026, 31/10/2026, 30/04/2027 or 30/04/2028 as the case may be).

  • Book an XP X 43-126 accredited laboratory in advance

    The number of competent laboratories remains limited in France; do not wait until the last few months before the deadline to start the process.

  • Budget the campaign as a dedicated item

    Do not equate it by default with a standard dioxin or heavy metal campaign: specific sampling train, 49 compounds to quantify.

  • Check the sampling architecture available

    An EN 1948-type sampling architecture, transferable in principle, may make implementation easier, without amounting to PFAS compliance in the absence of a finalised standard.

  • Follow the transposition of IED 2.0 even outside the scope of the order

    The 1 July 2026 transposition deadline and future sector BREF revisions may widen the scope of PFAS obligations.

  • Do not treat XP X 43-126 as a fixed standard

    Its status is experimental; follow the work of CEN/TC 264 and any revisions before final approval.

  • Document each campaign beyond the mere obligation

    Keep the detailed results by compound: they may serve as a reference if a specific limit value is later set in the operating permit.

Go further

Related standards

What we offer

Recommended instruments

Frequently asked

FAQ

Questions about this topic? Here are the most common answers.

Another question?
Is my installation covered by the PFAS order of 31 October 2024?+

Only if it falls under at least one of the ICPE headings 2770 (incineration of non-hazardous waste), 2771 (co-incineration of non-hazardous waste), 2971 (incineration/co-incineration of hazardous waste) or 3520 (incineration and co-incineration of waste, IED heading). Outside these headings, the order does not apply directly to date.

What is the next deadline for a large-capacity installation (≥ 15 t/h) under headings 2771 or 3520-a?+

31 October 2026, according to the order's staggered timetable. Lower-capacity installations under the same headings have additional time, until 30 April 2027.

What is the XP X 43-126 standard and is it really mandatory despite its experimental status?+

It is the French method for sampling and analysing 49 semi-volatile polar PFAS compounds in atmospheric emissions, published at the end of 2024 and inspired by the American method OTM-45. Its status is experimental (not definitively approved), but the order of 31 October 2024 explicitly designates it as the method to be applied for the campaigns it requires: the experimental status takes nothing away from the mandatory nature of its use in this context.

Is there a harmonised European or international standard for measuring PFAS in air?+

No, no harmonised ISO or CEN standard has been finalised to date. CEN/TC 264 has launched a working group dedicated to the subject, but with no known publication timetable at this stage.

What does IED 2.0 concretely add on PFAS compared with the French order?+

IED 2.0 (Directive (EU) 2024/1785, transposition expected by 1 July 2026 at the latest) adds PFAS substances to the list of polluting substances in its Annex II, which opens the possibility of setting limit values case by case in operating permits, as sector BREFs are revised, without setting a single harmonised threshold to date. Its scope is potentially wider than that of the French order, which covers only the thermal treatment of waste.

How much time should I allow to book an XP X 43-126 accredited laboratory?+

There is no published standard lead time, but the number of accredited laboratories remains limited in France since the first accreditations were issued in 2024, while several hundred installations are covered by the same national deadlines. It is recommended to start the process several months before your deadline rather than waiting until the last few weeks.

Does CDL-Tecora's DECS comply with the PFAS standard?+

The DECS is a sampling architecture for persistent organic pollutants compliant with EN 1948 and USEPA Method 23, presented as a transferable basis in principle for PFAS campaigns, but without claiming PFAS compliance as such, in the absence of a finalised harmonised standard on the subject. You should check with the laboratory in charge of the analysis the exact compatibility of the sampling train with the requirements of the XP X 43-126 method.